Frederick Melo
Pioneer Press
(MCT)
St. Paul police and fire officials on Thursday cordoned off the area around Seventh and St. Peter streets in downtown St. Paul — the Ecolab Corporate Center — after a large piece of metal cladding came loose from the roof of the company headquarters, some 20 stories above ground.
Firefighters and inspectors from the Department of Safety and Inspections on Thursday afternoon responded to 1 Ecolab Place, where a piece of sheet-metal flashing measuring roughly 4 feet by 8 feet was discovered to be loose about 200 feet off the ground. A contractor had attempted repairs Wednesday, but rain, snow and winds complicated access, according to city officials.
Emergency crews secured the sheet metal Thursday and closed the section of Seventh Street below it, with the expectation more permanent repairs will take place Saturday.
“It was a significant danger to the area below and we are not out of the woods,” said Suzanne Donovan, a DSI spokeswoman.
The damage was most likely caused by this week’s high winds, according to the Fire Department.
Related Articles
- News |April 14 public meeting on future of St. Paul’s Crosby Farm Park river center
- News |United Hospital in St. Paul and Regina Hospital in Hastings to merge in August
- News |St. Paul City Council appoints DSI to run point on rent control
- News |After donation, 13 saunas heading to St. Paul fire stations to help study cancer prevention
- News |State hearing on relocation of inpatient mental health from St. Joe’s on April 12
©2022 MediaNews Group, Inc. Visit attwincities.com. Distributed byTribune Content Agency, LLC.




















