普罗维登斯的水工厂。

普罗维登斯的水工厂。

Providence的水工程系统的价值。R. I.,1909年1月1日,以下设置如下:Pettaconset抽水站,$ 340,694:Hope Pumping Station,$ 112,151.77;Sockanosset,Hope和Fruit Hill水库,668,949.81美元;主线和分销管,$ 2,855,152.25;Pawtuxet和Lincoln的房地产,15,975美元;工具和用品,$ 39,942.03-总计,$ 4,032.865.45。今年前三个月的总支出为$ 11,847,297 82;截至1909年3月31日的净支出总额为$ 1,008,465.12。在本季度的第一季度,铺设了如下:八英寸,22.13英尺;6英寸1,689.05英尺,总计324 f英里。 Since the system was installed pipe has been laid as follows: Forty-two inch, 25,630 70 ft.: 36-in., 10. 208.82; 30-in., 61,4 10.07; 24-in., 16,228.40; 20 in.. 9,626.50; 10 in . 16,970.87; 12-in.. 128.231.03 ; 10 in.. 15,062.78: 8 in.. 316.552.14; 6 in., 1.304,017.60 -total, 1,963.939.06 ft. 371.958 1 miles. For the special water service for fire protection, since that work began pipe has been laid as follows; Twen ty four-inch. 4,209.14 ft.: 16 in.. 35,053.98; 12 in.. 5,422.25total, 44.775.67 ft 8.180 4 miles. One hydrant was added to those now set for special service fur fire protection making the whole number of these 2.175—2,031 flush. 144 post. I he total number of special lire hydrants set fur fire protection is 124. During the quarter 207 meters were set65 to replace others; total number set, 23,318. Ninety-eight new service-stops were opened during the quarter—making a total of 26. 352 in actual use. The average daily consumption of water during the quarter was 14,974.148 gal.

Providence的水工程系统的价值。R. I.,1909年1月1日,以下设置如下:Pettaconset抽水站,$ 340,694:Hope Pumping Station,$ 112,151.77;Sockanosset,Hope和Fruit Hill水库,668,949.81美元;主线和分销管,$ 2,855,152.25;Pawtuxet和Lincoln的房地产,15,975美元;工具和用品,$ 39,942.03-总计,$ 4,032.865.45。今年前三个月的总支出为$ 11,847,297 82;截至1909年3月31日的净支出总额为$ 1,008,465.12。在本季度的第一季度,铺设了如下:八英寸,22.13英尺;6英寸1,689.05英尺,总计324 f英里。 Since the system was installed pipe has been laid as follows: Forty-two inch, 25,630 70 ft.: 36-in., 10. 208.82; 30-in., 61,4 10.07; 24-in., 16,228.40; 20 in.. 9,626.50; 10 in . 16,970.87; 12-in.. 128.231.03 ; 10 in.. 15,062.78: 8 in.. 316.552.14; 6 in., 1.304,017.60 -total, 1,963.939.06 ft. 371.958 1 miles. For the special water service for fire protection, since that work began pipe has been laid as follows; Twen ty four-inch. 4,209.14 ft.: 16 in.. 35,053.98; 12 in.. 5,422.25total, 44.775.67 ft 8.180 4 miles. One hydrant was added to those now set for special service fur fire protection making the whole number of these 2.175—2,031 flush. 144 post. I he total number of special lire hydrants set fur fire protection is 124. During the quarter 207 meters were set65 to replace others; total number set, 23,318. Ninety-eight new service-stops were opened during the quarter—making a total of 26. 352 in actual use. The average daily consumption of water during the quarter was 14,974.148 gal.

如果您是当前的订户,访问这些内容。

如果您想成为订户,请访问我们这里

没有显示的帖子