水劳动报告。

水劳动报告。

特洛伊(N. Y.)水务委员会 - 截至1891年2月28日结束的年。1890年的水租金,$ 63,484.42;由店员收集,$ 28,377.67;年度总资源,114,971.62美元;债务有偿利息,15,422.50美元;有偿沉没基金,17,237.50美元;支付建设,$ 12,456.70;付费一般目的,$ 37,873.67:总付款,$ 82,990.37;1891年3月1日在手头上显示余额,$ 31,981.25。1889年的普通水金额增加了420.80美元,在办公室收据中增加了5,931.01美元,净收入增加了6,351.40美元。 Two hundred and twenty-six meters are now in use. A marked reduction in the daily conwater was noticeable, the average being about 5,600,000 gallons on the low service, attributable in a large degree to the use of meters. The quantity registered By meters for the year was 336,737,537 gallons. During the year 132 house laterals were put in, of which 123 were by the department and 9 by plumbers. The water mains were extended by the addition of 5358 feet of new pipe ranging in size from 24 to 6 inches. The total length of all the mains is 56 miles and 4777 feet. Twenty-three fire hydrants and 42 valves were placed on new work. The total cost of construction, which includes mains laid and hydrants and valves put in, was $12,456.70. The entire cost of the works to date, March 1, 1891, was $1,208,823 29. The bonded indebtedness is $378,500. The payments made last year for interest and sinking fund accounts were $27,660. Superintendent Dolan recommends the following work for this year : New roof on valve vault; the construction of a foot bridge from inlet pier, so that employees can go there at all seasons of the year; the steam cylinders and steam pipes to be recovered with nonconducting covering to prevent loss by condensation; the building of a new grating at inlet on west side of pier and masonry to be repointed. The ceilings and wells and outside woodwork of station to be painted ; a drain or sewer to be built from house to the river; sidewalks on Main street to be repaired and strengthened. Also the following on distribution : Extending 24-inch main down North Fourth street to connect with the present 24-inch main in said street, and the nutting in of two blow-offs in the southern end of the city for the purpose of cleaning the mains, and the building of a new barn in the rear of office.

奥罗拉(Aurora),iii。至今1890年。W. Corbett,校长。在这一年中,制造了22,863英尺的水主要扩展,该系统现在包括29英里的1833英尺。泵水的数量为337,424,000加仑,平均每日923,160 2/3加仑,支出为788.338吨煤炭。年度收入为$ 12,702,支出为27,657美元。报告说,这种缺陷主要源于以下事实:只有1362名接管者,或者说46英里的管道,其他居民在主管上获得完全防火的线条,同时对维护没有任何贡献作品。校长认为在许多情况下的利率过低,并建议采用某些计划来增加部门的收入。

如果您是当前的订户,访问此内容。

如果您想成为订户,请访问我们这里

没有显示的帖子