Leominster系统的扩展。
马萨诸塞州的莱明斯特继续扩展其水厂服务。在过去的一年中,它收到了61个申请 - 使用2,775的服务总数为3,543英尺的服务管道铺设,如下所示:86英尺6英寸。铸铁管;39英尺4英寸。铸铁管;178英尺2英寸。锻铁,水泥衬里的管道;209英尺1 1/2英寸。锻铁,水泥衬里的管道;1英寸1英寸。 wrought iron, cement-lined pipe. The above were charged to applicants—total 2,164 feet; 1,170 feet of 1-in. wrought iron, cementlined pipe was charged to the town. The mains were extended by 3,611 ft. of 8-in. to 2-in., and 5,554 ft. of wrought iron pipe 8-in. to 2-in. has been replaced by cast iron pipe of the same diameter. Six public hydrants and one private were set—making a total of 365 public and twentytwo private hydrants set. Twenty gates, 6-in. to 4 in. were added to the 271 already set. Since the change began to be made, 92,936 ft. of cement pipe has been replaced by iron. The total amount at present in use is 1.43 mile; of iron, 49.36— total of mains laid, 50.79 miles 30-in. to 2-in. The amount of fiat rates paid was $6,467.02; water rates charged, $21,895.58; for public use, $15,815, and $44,178.03. The total expenditures amounted to $14,8('2.06—a net gain of $29,315.97 for eleven months. The total amount laid out in construction, with balance of $202,756.44, available for general expenses of the town, has been $584,980.90—deducting $318,091.35 received for public use, the balance is $266,885.59 free from charges. W. J. W etherbee is superintendent and registrar.
马萨诸塞州的莱明斯特继续扩展其水厂服务。在过去的一年中,它收到了61个申请 - 使用2,775的服务总数为3,543英尺的服务管道铺设,如下所示:86英尺6英寸。铸铁管;39英尺4英寸。铸铁管;178英尺2英寸。锻铁,水泥衬里的管道;209英尺1 1/2英寸。锻铁,水泥衬里的管道;1英寸1英寸。 wrought iron, cement-lined pipe. The above were charged to applicants—total 2,164 feet; 1,170 feet of 1-in. wrought iron, cementlined pipe was charged to the town. The mains were extended by 3,611 ft. of 8-in. to 2-in., and 5,554 ft. of wrought iron pipe 8-in. to 2-in. has been replaced by cast iron pipe of the same diameter. Six public hydrants and one private were set—making a total of 365 public and twentytwo private hydrants set. Twenty gates, 6-in. to 4 in. were added to the 271 already set. Since the change began to be made, 92,936 ft. of cement pipe has been replaced by iron. The total amount at present in use is 1.43 mile; of iron, 49.36— total of mains laid, 50.79 miles 30-in. to 2-in. The amount of fiat rates paid was $6,467.02; water rates charged, $21,895.58; for public use, $15,815, and $44,178.03. The total expenditures amounted to $14,8('2.06—a net gain of $29,315.97 for eleven months. The total amount laid out in construction, with balance of $202,756.44, available for general expenses of the town, has been $584,980.90—deducting $318,091.35 received for public use, the balance is $266,885.59 free from charges. W. J. W etherbee is superintendent and registrar.



















