By Chuck DeLuca
Although all of the tradi- tional size-up points (Construction, Occupancy, Apparatus and Personnel, Life Hazard, Water Supply, Auxiliary Appliances, Street Conditions, Weather, Exposures, Area, Location/Extent/ Volume of Fire, Time, and Height) are always important, some pertain more to the engine company and how it will eventually operate.
The following size-up points should be priorities for the engine company to identify and fulfill to the best of its ability.
If you are a current subscriber,login hereto access this content.
If you would like to become a subscriber, please visit ushere.





















