一项巨大的工作。

一项巨大的工作。

我们要感谢马萨诸塞州新贝德福德的标准,以下描述了Fairhaven的新站立管和插图:Fairhaven Waterworks System的Stantpipe上的工作正在迅速进行广告,以及存储的列。坦克休息已经达到79英尺的高度。完成后,结构将是该州本部分中最引人注目的地标。Its erection is an engineering feat of no small magnitude, and is being accomplished under the direction of Martin Bullister, foreman for Riter & Conley of Pittsburgh, Pa., who were awarded the contract, A force of twenty skilled mechanics from the firm’s factory are engaged upon the work, and it is expected that about two months will be required for its completion, at which time the entire system will be in readiness for operation.

该储罐的直径为35英尺,身高五十英尺,容量为380,000加仑。它将依靠十二列,每列将承受过多的重量。从陆地到屋顶的最高点,结构将踩踏198英尺和六英寸。圆柱底部描述的圆圈为六十一英尺和九英寸,这是逐渐朝向顶部的逐渐变细的。这样塔将成为醒目的美丽的对象。每柱都落在石头和混凝土的坚实基础上。地基被铺设到五半英尺的深度,在石头下方放置了三英尺平方的重钢板。砌体在底座上铺设了九英尺平方,逐渐逐渐变细到地面上的花岗岩的固体块,四英尺正方形。从底部钢棒的钢板直径为一英寸和一半英寸的钢板延伸至柱的底部,从而将其牢固地固定。这些圆柱是一半英寸的钢板。 A cross section would be in the shape of a capital H with the perpendicular lines fourteen inches in length and the horizontal line seventeen inches.

如果您是当前的订户,访问此内容。

如果您想成为订户,请访问我们这里

没有显示的帖子